Work in Progress

Apr., 2008

Collection of April ('08) Site Photos (Adobe Acrobat - PDF format)   
Collection includes:

PARK PLACE - PHASE III
PARK PLACE - PHASE III Interior Courtyard w/ Gazebo Under Construction
PARK PLACE - PHASE III Lower Level Unit w/ Bathroom Components Installed
PARK PLACE - PHASE III Bedroom with Emergency Pull Cord (in Red) @ Wall
PARK PLACE - PHASE III Lower Level Unit w/ Kitchen Components Installed
PARK PLACE - PHASE III Living Room Area
PARK PLACE - PHASE III BG, Inc. Program Management Bathroom with Emergency Pull Cord (in Red) @ Wall
PARK PLACE - PHASE III Unit Showing Kitchen, Entry, Bathroom Area
PARK PLACE - PHASE III Unit Showing Living, Patio and Bedroom Areas
PARK PLACE - PHASE III Corridor with Pop-up Ceiling Near Unit Entries
PARK PLACE - PHASE III Upper Level Units with Incomplete Bathroom and Kitchen Cabinetry Installations
PARK PLACE - PHASE III Courtyard Gazebo
PARK PLACE - PHASE III Courtyard w/ Gazebo
MASON CITY HOUSES

 

Mar., 2008

Collection of March ('08) Site Photos (Adobe Acrobat - PDF format)   
Collection includes:

PARK PLACE - PHASE III
Masonry Installations
Kitchen/Living Area
Stockpiled Gypsum Board on an Upper Level
Framing at Lower Level for Mailboxes
Corner Unit View w/ Balcony Beyond
Living Area of Interior Unit w/ Courtyard Beyond
Kitchen Plumbing Wall

 

Feb., 2008

Collection of February ('08) Site Photos (Adobe Acrobat - PDF format)   
Collection includes:

PARK PLACE - PHASE III Interior courtyard w/ HardiBoard & Building Wrap Installed
Interior Courtyard w/ Painted HardiBoard (above) and Split Face Block & Face Brick (below)
Interior Courtyard w/ Painted HardiBoard (above) and Split Face Block (below)
Framed Interior at Main Office Area
Tub/Shower Fixture - Installed
Main Electrical Service into Building.
Electrical Panel at the Unit
Elevator Jack System

GLENBROOK AT OXMOOR Property to Left of Road is Property Planned for Development

MASON CITY House on 15th Street & Jackson Ave. SW
House on 16th Street SW
House on 14th Place SW

 

Jan., 2008

Collection of January ('08) Site Photos (Adobe Acrobat - PDF format)   
Collection includes:

PARK PLACE - PHASE III

Exterior Plywood Installed w/ Partial Building Wrap Installed
Interior Plumbing Distribution Panel
Tub/Shower Fixture in Protective Wrapping, Prior to Installation
Interior Partition Framing with Corner Balcony Beyond
Framed Interior Corridor
Upper Level Interior Partition Framing with Roof Truss Above
Framing @ Interior Courtyard Area

 

Dec., 2007

Collection of December Site Photos (Adobe Acrobat - PDF format)   
Collection includes:

PARK PLACE - PHASE III First Floor Wall Framing

PARK PLACE - PHASE III Elevator Pit Plunger

 

Nov., 2007

Collection of November Site Photos (Adobe Acrobat - PDF format)   
Collection includes:

PARK PLACE - PHASE III Building Staking & Underground Plumbing Stub-Ups

PARK PLACE - PHASE III On-Site Stored Materials

 

Oct., 2007

Collection of October Site Photos (Adobe Acrobat - PDF format)   
Collection includes:

PARK PLACE - BLOCK ‘B’ NORTH Building Staking & Underground Utilities Installations)

PARK PLACE - BLOCK ‘B’ NORTH Underground Utilities Installations

PARK PLACE - BLOCK ‘B’ NORTH On-Site Stored Materials

 

Sept., 2007

Collection of September Site Photos (Adobe Acrobat - PDF format)   
Collection includes:

PARK PLACE - BLOCK ‘B’ NORTH Rendering of Proposed 76-Unit 4 Story Mid-Rise Building Intersection of 22nd Street and Park Place, looking NorthEast

PARK PLACE - BLOCK ‘B’ NORTH Site Clearing/Cleaning in Prep for Construction of Mid-Rise Building

PARK PLACE - BLOCK ‘B’ NORTH Site Clearing/Cleaning in Prep for Construction of Mid-Rise Building

 

Feb., 2007

Collection of February Site Photos (Adobe Acrobat - PDF format)   
Collection includes:

SOUTHAMPTON – Ribbon Cutting Ceremony (Home)

SOUTHAMPTON – Ribbon Cutting Ceremony (Participants)

 

Dec., 2006

Collection of December 2006 Site Photos (Adobe Acrobat - PDF format)   
Collection includes:

BLOCK ‘D’ – GREEN STREET - Street Cleaning

BLOCK ‘D’ – GREEN STREET - Landscape Installations

BLOCK ‘E’ – GREEN STREET - Asphalting Of Street

BLOCK ‘F’ – BUILDING 8 - Completed Cleaned Units

BLOCK ‘D’ – BUILDING 10 - Completed Cleaned Unit

BLOCK ‘F’ – BUILDING 3 - Tenant Items on Balcony

BLOCK ‘E’ – Completed Buildings

BLOCK ‘D’ – Completed Buildings

SOUTHAMPTON – Completed Houses

Nov., 2006

Collection of Nov 28 and Dec 6, 2006 Site Photos (Adobe Acrobat - PDF format)   
Collection includes:

BLOCK ‘F’ – BUILDING 1
Rear Elevation

BLOCK ‘F’ – BUILDING 3
Front Elevation

BLOCK ‘F’ – BUILDING 5
Substantially Complete/Cleaned Up Units

BLOCK ‘D’ – BUILDING 11
Substantially Complete/Cleaned Up Units

BLOCK ‘E’ – REAR OF BUILDING 7
Newly Planted Trees in Passive Park Area

BLOCK ‘D’ – BUILDING 10
Appliances and Fixtures Installations

BLOCK ‘D’ – BUILDING 11
Carpet padding installation

BLOCK ‘D’ – BUILDING 12
Trees To Be Planted

BLOCK ‘D’ – BUILDING 12
Sidewalk / ADA Ramp Formwork

BLOCK ‘D’ – BUILDING 15

BLOCK ‘D’ – BUILDING 15
Mail Kiosk Construction

BLOCK ‘D’ – BUILDING 16
Appliances To Be Installed

BLOCK ‘D’ – BUILDING 16
Typical Kitchen counter installation

BLOCK ‘D’ – BUILDING 16
near substantial completion

 
SEPT., 2006

Collection of Sept., 2006 Site Photos (Adobe Acrobat - PDF format)   
Collection includes:

AERIAL VIEW – LOOKING WEST

BLOCK ‘F’ EAST – NEAR BUILDING 2
Irrigation Piping Being Installed

BLOCK ‘E’ – BUILDING 6
Kitchen Area

BLOCK ‘E’ – BUILDING 6

BLOCK ‘E’ – BUILDING 7
Newly Installed Decorative Light Fixture in Parking Area

BLOCK ‘E’ – NEAR BUILDING 7
Freshly Poured Sidewalk
Mail Kiosk and Trash Container Enclosures

BLOCK ‘D’ – BUILDING 11
Installed Ceiling Elements (Light Fixtures/Smoke Detector)
Installed Sink w/ Fixtures & Unpainted Trim

BLOCK ‘D’ – BUILDING 11
Bathroom

BLOCK ‘D’ – BUILDING 11
Pressure Washing the Exterior Brick

BLOCK ‘D’ – BUILDING 12
Junction Boxes for yet to be Installed Ceiling Elements
Incomplete Bathroom

BLOCK ‘D’ – NEAR BUILDING 13
APCO At Work
Cable From Transformer to buildings

BLOCK ‘D’ – BUILDING 14
Laundry Area

BLOCK ‘D’ – BUILDING 14
Kitchen Area

BLOCK ‘D’ – BUILDING 15
Exterior Carroway Blvd. Side

BLOCK ‘D’ – BUILDING 15
Kitchen Area

BLOCK ‘D’ – BUILDING 15
Utility Closet and Laundry Closet

BLOCK ‘D’ – BUILDING 16
Kitchen Area

CONSTRUCTION OF HOUSES IN SOUTHHAMPTON


 

April, 2006


FEB., 2006
  • Collection of Feb., 2006 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:

    BLOCK ‘F’ EAST – BUILDING 1
    Scaffolding for Brick Installation

    BLOCK ‘F’ EAST – BUILDING 1
    Kitchen Area

    BLOCK ‘F’ EAST – BUILDING 2
    Tiled Bathtub/Shower

    BLOCK ‘E’ – BUILDING 4
    Bedroom w/ Uninstalled Doors & Frames

    BLOCK ‘E’ – BUILDING 5
    Kitchen Area in Loft Unit Building

    BLOCK ‘E’ – BUILDING 5
    Framing @ Mechanical Duct Bulkhead

    BLOCK ‘E’ – BUILDING 5
    Firestop Material Applied to Electrical Boxes @ a Common Units Wall

    BLOCK ‘E’ – BUILDING 6
    Siding Installation

    BLOCK ‘E’ – BUILDING 6
    Siding Trim Installation

    BLOCK ‘E’ – BUILDING 8
    Laundry Area

    BLOCK ‘E’ – BUILDING 7
    Framed Walls @ Bathroom Area

    BLOCK ‘E’ – BUILDING 9
    Kitchen Area

    BLOCK ‘E’ – BUILDING 9
    Above Ceiling Mechanical Ductwork

    BLOCK ‘D’ – BUILDING 15

    BLOCK ‘D’ – BUILDING 12
    Roofing Membrane Installation

    BLOCK ‘D’ – BUILDING 13
    Roofing Decking Installation

    BLOCK ‘D’ – BUILDING 14
    Without Roof Truss Installed

    BLOCK ‘D’ – BUILDING 13
    Roof Truss

    CONSTRUCTION @ YMCA ON 7TH AVENUE
    A Grant Program Neighborhood Partner

Jan., 2006
  • Collection of Jan., 2006 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:
    AERIAL VIEW – LOOKING WEST

    BLOCKS ‘E’ & ‘F”

    BLOCK ‘F’ EAST – BUILDING 1
    Interiors w/ primed walls, door frames yet to be installed

    BLOCK ‘F’ EAST – BUILDING 2
    Walled in Kitchen area

    BLOCK ‘‘F’ EAST’ – BUILDING 3
    Scaffold for masonry installation

    BLOCK ‘E’ – BUILDING 4
    Walled in Kitchen area

    BLOCK ‘E’ – BUILDING 6
    Installation of Roofing Shingles in Progress

    BLOCK ‘E’ – BUILDING 6
    Kitchen area

    BLOCK ‘E’ – NORTH OF BUILDING 4
    Infrastructure Installation

    BLOCK ‘E’ – NORTH OF BUILDING 7
    Kitchen area

    BLOCK ‘D’ – NORTH OF BUILDING 11
    Installation of Roofing Felt Material

    BLOCK ‘E’ – NORTH OF BUILDING 15
    w/ Partial Building Wrap Installed and Window Installations in Progress

    BLOCK ‘D’ – NORTH OF BUILDING 12
    Walls on Third Floor, still being Installed

    BLOCK ‘D’ – BUILDING 16
    Installation of Roof Deck

    CONSTRUCTION @ YMCA ON 7TH AVENUE
    A Grant Program Neighborhood Partner

Dec., 2005
  • Collection of Dec., 2005 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:
    BLOCK ‘F’ EAST – BUILDING 1
    With partial installation of hardi-plank siding

    BLOCK ‘F’ EAST – BUILDING 1
    With bathtubs and inner wall electrical and plumbing items in place.
    With firestop material installed

    BLOCK ‘E’ – BUILDING 4
    With building wrap and windows installed

    BLOCK ‘E’ – BUILDING 4
    With inner wall plumbing in bathroom, bathtub has yet to installed
    Framed kitchen area, w/ inner wall plumbing and electrical components

    BLOCK ‘E’ – BUILDING 5
    With building wrap installed

    BLOCK ‘E’ – BUILDING 5
    Interior framing

    BLOCK ‘E’ – BUILDING 6
    With roof and interior framed

    BLOCK ‘E’ – BUILDING 7
    With building wrap, w/ out roof trusses

    BLOCK ‘E’ – BUILDING 7
    With framing at kitchen

    BLOCK ‘E’ – BUILDING 9
    With partial exterior sheathing and wrap installed

    BLOCK ‘D’ – BUILDING 11
    With floor truss for 3rd floor installed atop 2nd floor interior walls w/ exterior sheathing, w/ building wrap at 1st floor.

    BLOCK ‘D’ – BUILDING 15
    With 2nd floor interior walls being framed, w/ exterior sheathing at 1st floor

    BLOCK ‘D’ – BUILDING 16
    Framing for first floor walls.

    BLOCK ‘D’ – BUILDING 13, 12 & 10
    Poured building slabs for buildings 13, 12 & 10 w/ building 8 on block E in background

Nov., 2005
  • Collection of Nov., 2005 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:
    PARK PLACE – Aerial LOOKING WEST

    BLOCK ‘F’ EAST – BUILDING 2
    Installation of building wrap in progress

    BLOCK ‘F’ EAST – BUILDING 1
    Interior wall framing with plumbing, mechanical and electrical rough-ins

    BLOCK ‘F’ EAST – BUILDING 1
    Kitchen rough-ins

    BLOCK ‘F’ EAST – BUILDING 1
    Laundry Room inner wall plumbing

    BLOCK ‘F’ EAST – BUILDING 1
    Supplemental blocking in wall for handrail

    BLOCK ‘F’ EAST – BUILDING 2
    Breezeway with freshly poured concrete

    BLOCK ‘E’ – BUILDING 8
    Materials for wall framing being hauled onto building

    BLOCK ‘E’ – BUILDING 6 (foreground), 4 (beyond)
    Building 4 with roofing plywood installation in progress
    Building 6 with floor truss for second floor installed

    BLOCK ‘E’ – BUILDING 8
    Tilt-up of framing for second floor wall

    BLOCK ‘E’ – BUILDING 7
    Floor truss (foreground) prior to installation

    BLOCK ‘E’ – BUILDING 9
    Building slab in place

    BLOCK ‘D’ – BUILDING 15
    Building slab in place

    BLOCK ‘D’ – BUILDING 13
    Footing trench preparation prior to slab pour

    BLOCK ‘C’ – LEASING BUILDING
    Installation of decorative brackets

Oct., 2005
  • Collection of Oct., 2005 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:
    PARK PLACE – Aerial Photo looking West

    South to North View of Parking Lot @ Block ‘A’
    BLOCK ‘A’ – DEMOLITION COMPLETE / PARKING LOT INSTALLED / STRIPED

    BLOCK ‘F’ EAST – BUILDING 1
    ‘Stick’ built interior wall framing w/ plumbing.

    BLOCK ‘F’ EAST – BUILDING 2
    Installation of Pre-Fab Roof Trusses

    BLOCK ‘F’ EAST – BUILDING 3
    Third floor truss have been installed, interior wall framing has begun.

    BLOCK ‘F’ EAST – BUILDING 3
    Interior stair being built.

    BLOCK ‘E’ – BUILDING 4
    1st Level Framed Walls

    BLOCK ‘E’ – BUILDING 5
    Preparing door and window headers.

    BLOCK ‘E’ – BUILDING 9
    On-site delivered wood for framing.

    BLOCK ‘D’ – BUILDING 15
    Trenches/forming for flowable fill @ footings/foundation wall, gravel bed for floor slab.

    BLOCK ‘D’ WEST
    Building 14 slab in foreground w/ plumbing stubups for buildings 13, 12 & 10, exposed

    PROJECT PLANNING AREA
    Scan of Phase 1 & 2 16 block area map

    PROJECTED PROJECT SITE
    Looking Northwest from the 6th Avenue North/17th Street North Intersection

Sept., 2005
  • Collection of Sept., 2005 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:

    CITY OF BIRMINGHAM / UKRAINE OFFICALS DELEGATION

    BLOCK ‘A’ – DEMOLITION COMPLETE
    Southern Portion Asphalted for Parking Lot for Park Place Phases I & II
    Northern Portion Seeded w/ Straw Covering

    BLOCK ‘B’ Fresh Finish Topping at Green Street (also occurred in Block C)

    BLOCK ‘F’ EAST – BUILDINGS 2 & 3
    Poured Slabs w/ Lumber for Framing Stacked on Site

    BLOCK ‘E’ – BUILDING 4
    Slab Pour in Progress

    BLOCK ‘E’ – BUILDING 8
    Digging Perimeter Trenches for Flowable Fill

    BLOCK ‘E’ – BUILDING 9
    Formwork in Place for Slab Pour w/ Underslab Gravel in Place at Far End

    BLOCK ‘D’
    Welded Wire Mesh for Slabs Stored on Site
    Building Pads for Buildings 13 & 14
    PVC Piping for Underslab Utilities
    Building Pad for Building 15

Aug., 2005
  • Collection of Aug., 2005 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:

    BLOCK ‘F’
    Poured Building Slabs w/ Exposed Utility Stub-ups

    BLOCK ‘E’
    Prep to pour concrete for footings
    Underground plumbing/electrical stubups

    BLOCK ‘E’ FOOTING TRENCHWORK

    BLOCK ‘D’ (Looking West/North)
    Building Pad For ‘Terminus Building’ at the End of Park Place

    BLOCK ‘A’
    HazMat Container
    Excavated Steam Tunnel

June, 2005
  • Collection of June, 2005 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:

    AERIAL VIEW – LOOKING EAST

    BLOCK ‘A’
    Demolition in Progress

    BLOCK ‘C’ BUILDING 4
    South Elevation

    BLOCK ‘C’ BUILDING 4
    Kitchen Area

    BLOCK ‘C’ BUILDING 4
    Living Room Area in a First Floor Unit

    BLOCK ‘C’ BUILDING 4
    Second Floor Interior Corridor

    BLOCK ‘C’ BUILDING 4
    Second Floor Laundry Room

    BLOCK ‘C’ LEASING BUILDING
    South Elevation

    BLOCK ‘C’ LEASING BUILDING
    Atrium Area w/ Freshly Installed Molding/Trim

    BLOCK ‘C’ LEASING BUILDING
    Lower Level Atrium Area w/ Freshly Installed Molding/Trim

    BLOCK ‘D’ West
    Site Prep for Building Pads & Green Street

    BLOCK ‘D’ EAST
    Site Prep for Green Street & Building Pads

    BLOCK ‘E’ WEST
    Rough Grading

    BLOCK ‘E’ EAST
    Rough Grading

May, 2005
  • Collection of May, 2005 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:

    AERIAL VIEW – LOOKING NORTH

    BLOCK ‘A’
    Commencement of Demolition

    BLOCK ‘A’
    Demolition in Progress

    BLOCK ‘C’ BUILDING 4
    Tyvek Wrapped North Elevation

    BLOCK ‘C’ BUILDING 4
    Installed Plumbing Fixtures / Electrical Panel

    BLOCK ‘C’ BUILDING 4
    Attic Area Gypsum Board Fire Wall

    BLOCK ‘C’ LEASING BUILDING
    Atrium Area

    BLOCK ‘C’ LEASING BUILDING
    From Second Floor Into Atrium Area

    BLOCK ‘E’
    Rough Grading

March, 2005
  • Collection of March, 2005 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:

    AERIAL VIEW – LOOKING WEST

    BLOCK ‘C’ – BUILDING 10 Completed Unit Prepared for PTO Walk Thru

    BLOCK C NORTH – BUILDING 18; LEASING CENTER Brick Installation in Progress

    BLOCK C NORTH – BUILDING 18; LEASING CENTER Brick Installation in Progress

    BLOCK C NORTH – BUILDING 4 Roof Substrate Installation in Progress

    BLOCK ‘F’ – BUILDING 2

    BLOCK ‘F’ – BUILDING 1

Sept., 2004
  • Collection of Sept, 2004 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:

    BLOCK ‘B’ - BUILDING 14
    Exterior Painting

    BLOCK ‘B’ – BUILDING 14
    Interior Installations – Carpet w/ pad & Kitchen Appliances/Floor Tile

    BLOCK ‘B’ - BUILDING 14
    Interior Installations; Washer/Dryer (Above)
    Utility Closet w/ Furnace/Water Heater & Thermostat/Security Panel on Wall

    BLOCK ‘B’ - BLDG. 14
    Form Work in Preparation to Pour Side Walk
    Pre-Cast Wall Caps @ Entry Stoop

    BLOCK ‘B’ - INNER COURTYARD
    Parking Area Surface, Poured Concrete in Segments

    BLOCK ‘C’ - BUILDING 10
    Framing for Interior Spaces

    BLOCK ‘C’ - BUILDING 10
    Installation of Siding

    BLOCK ‘C’ - BUILDING 7
    Installation of Brick

    BLOCK ‘C’ - BUILDING 6
    Curved Plywood as Formwork to Lay Bricks in Arch

    BLOCK ‘C’ - BUILDING 5
    w/ Underlayment Board & Roofing Felts

    BLOCK ‘C’ - BUILDING 18
    Leasing Office Building – ‘Stick’ Built Framed

    BLOCK ‘F’ - BUILDING 3
    Framed to 2nd Floor w/ Roof Framing on Ground

July, 2004
  • Collection of July, 2004 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:
    BLOCK ‘F’ – BUILDING 1
    Freshly Poured Building Slab

    BLOCK ‘F’ – TRENCH FOR IRRIGATION SYSTEM

    BLOCK ‘F’ – SOD INSTALLATION

    BLOCK ‘C’ – LEASING BUILDING Poured Slabs For Leasing Building Near Base of Smokestack

    BLOCK ‘C’ - BUILDING SLABS
    Poured Slabs w/ Underground Plumbing Stubups
    Building 5 – Foreground
    Building 7 – Beyond
    W/ Block ‘B’ & Downtown Skyline

    BLOCK ‘C’ - BUILDING 9
    Sub-roofing Installations

    BLOCK ‘B’ - BUILDING 14
    Thru Floor Pipes w/ Code Required Fire Stop Material

    BLOCK ‘B’ - BUILDING 14
    Newly Installed Bathtub

    BLOCK ‘B’ - BUILDING 14
    Construction of Entryway Canopy

    BLOCK ‘B’ - BUILDING 13
    Electrician’s Pre-wiring A Unit

    BLOCK ‘B’ - BUILDING 13
    Tyvek Insulation Wrapped Building

    BLOCK ‘B’ - BUILDING’S 17 & 15
    Off-Street Parking Side of Each Building

    BLOCK ‘B’ - BUILDING 17
    From The Street Side Exterior Facade

June, 2004
  • Collection of June, 2004 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:
    BLOCK ‘B’ - BUILDINGS
    • Buildings 14 & 15 w/ exterior brick, hardy board siding & windows installed
    • Building 17 @ rear w/ exposed tyvek moisture protection
    • Building 13 @ left w/ exposed exterior wood sheathing
    • Building 12 slab in foreground

    BLOCK ‘B’ - BUILDING 14
    Plumbing @ Laundry Room wall w/ PVC drain lines, red & blue (hot & cold) pex piping

    BLOCK ‘B’ - BUILDING 14
    Installed Flex Mechanical Duct Work & Sprinkler Lines (orange piping) in ceiling space

    BLOCK ‘B’ - BUILDING 17
    Framed Living Room in a Townhouse Unit overlooking 22nd Street

    BLOCK ‘C’ NORTH - BUILDING 9
    Installing Floor Truss (additional truss in foreground)

    BLOCK ‘C’ NORTH - BUILDING 10
    Underslab Utilities / Trenches to form thickened slabs, at wall locations.

    BLOCK ‘C’ NORTH - BUILDING 6
    Markings on slab indicating wall / door locations and location numbers for the various wall panels

    MARCONI PARK
    Mock-up of truncated pavers inset

    BLOCK ‘F’ WEST - BUILDING 3

    • Preparing for footing trenches
    • Form filled footing trench in foreground

    BLOCK ‘D’
    Wiring installation at new light fixture

May, 2004
  • Collection of May, 2004 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:
    BLOCK ‘B’ - BUILDING’S 16 & 17 - From The 3rd Floor Of Building 14 – A View Of Downtown
    BLOCK ‘B’ - BUILDING 14- Green Street Elevation
    BLOCK ‘B’ - BUILDING 14 Wiring To Electrical Panel W/ Sheetrock in Background
    BLOCK ‘C’ NORTH - BUILDING 9 Underslab Work: Gravel, Plumbing Stubups
    SIDEWALK CORNER WORK - Intersection of 6th Avenue & 25th Street
April, 2004
March, 2004
  • Collection of March, 2004 Site Photos (Adobe Acrobat - PDF format)   
    Collection includes:
    BUILDING #17: PLUMBING STUB-UPS
    BUILDING’S SAMPLE MOCK-UP
    BLOCK ‘C’: GREEN STREET LOOKING EAST
    BLOCK ‘C’: GREEN STREET LANDSCAPING
    24TH STREET – LOOKING SOUTH FROM 7TH AVENUE - SEWER LINES AND LATERALS HAVE BEEN INSTALLED
    NEW SIDEWALK ALONG CALLOWAY AVENUE
December, 2003
November, 2003
September, 2003
September, 2002
August, 2002
March, 2002

Jump To Top

 

Copyright © 2002 Boulevard Group, Inc.
484 Boulevard, SE
Atlanta, GA  30312
Main: (404) 622-7879
Support: (678) 428-8635  (Anytime Night or Day)
E-mail: Support

Release: 1.01.001  Release Date: June 7, 2003