Work in Progress
Apr., 2008
Collection of April ('08) Site
Photos (Adobe Acrobat - PDF format) Collection
includes:
PARK PLACE - PHASE III
PARK PLACE - PHASE III Interior Courtyard w/ Gazebo Under Construction
PARK PLACE - PHASE III Lower Level Unit w/ Bathroom Components Installed
PARK PLACE - PHASE III Bedroom with Emergency Pull Cord (in Red) @ Wall
PARK PLACE - PHASE III Lower Level Unit w/ Kitchen Components Installed
PARK PLACE - PHASE III Living Room Area
PARK PLACE - PHASE III BG, Inc. Program Management Bathroom with Emergency Pull Cord (in Red) @ Wall
PARK PLACE - PHASE III Unit Showing Kitchen, Entry, Bathroom Area
PARK PLACE - PHASE III Unit Showing Living, Patio and Bedroom Areas
PARK PLACE - PHASE III Corridor with Pop-up Ceiling Near Unit Entries
PARK PLACE - PHASE III Upper Level Units with Incomplete Bathroom and Kitchen Cabinetry Installations
PARK PLACE - PHASE III Courtyard Gazebo
PARK PLACE - PHASE III Courtyard w/ Gazebo
MASON CITY HOUSES
Mar., 2008
Collection of March ('08) Site
Photos (Adobe Acrobat - PDF format) Collection
includes:
PARK PLACE - PHASE III
Masonry Installations
Kitchen/Living Area
Stockpiled Gypsum Board on an Upper Level
Framing at Lower Level for Mailboxes
Corner Unit View w/ Balcony Beyond
Living Area of Interior Unit w/ Courtyard Beyond
Kitchen Plumbing Wall
Feb., 2008
Collection of February ('08) Site
Photos (Adobe Acrobat - PDF format) Collection
includes:
PARK PLACE - PHASE III
Interior courtyard w/ HardiBoard & Building Wrap Installed
Interior Courtyard w/ Painted HardiBoard (above) and Split Face Block & Face Brick (below)
Interior Courtyard w/ Painted HardiBoard (above) and Split Face Block (below)
Framed Interior at Main Office Area
Tub/Shower Fixture - Installed
Main Electrical Service into Building.
Electrical Panel at the Unit
Elevator Jack System
GLENBROOK AT OXMOOR
Property to Left of Road is Property Planned for Development
MASON CITY
House on 15th Street & Jackson Ave. SW House on 16th Street SW
House on 14th Place SW
Jan., 2008
Collection of January ('08) Site
Photos (Adobe Acrobat - PDF format) Collection
includes:
PARK PLACE - PHASE III
Exterior Plywood Installed w/ Partial Building Wrap Installed
Interior Plumbing Distribution Panel
Tub/Shower Fixture in Protective Wrapping, Prior to Installation
Interior Partition Framing with Corner Balcony Beyond
Framed Interior Corridor
Upper Level Interior Partition Framing with Roof Truss Above
Framing @ Interior Courtyard Area
Dec., 2007
Collection of December Site
Photos (Adobe Acrobat - PDF format) Collection
includes:
PARK PLACE - PHASE III
First Floor Wall Framing
PARK PLACE - PHASE III
Elevator Pit Plunger
Nov., 2007
Collection of November Site
Photos (Adobe Acrobat - PDF format) Collection
includes:
PARK PLACE - PHASE III
Building Staking & Underground Plumbing Stub-Ups
PARK PLACE - PHASE III
On-Site Stored Materials
Oct., 2007
Collection of October Site
Photos (Adobe Acrobat - PDF format) Collection
includes:
PARK PLACE - BLOCK B NORTH
Building Staking & Underground Utilities Installations)
PARK PLACE - BLOCK B NORTH
Underground Utilities Installations
PARK PLACE - BLOCK B NORTH
On-Site Stored Materials
Sept., 2007
Collection of September Site
Photos (Adobe Acrobat - PDF format) Collection
includes:
PARK PLACE - BLOCK B NORTH
Rendering of Proposed 76-Unit 4 Story Mid-Rise Building
Intersection of 22nd Street and Park Place, looking NorthEast
PARK PLACE - BLOCK B NORTH
Site Clearing/Cleaning in Prep for Construction of Mid-Rise Building
PARK PLACE - BLOCK B NORTH
Site Clearing/Cleaning in Prep for Construction of Mid-Rise Building
Feb., 2007
Collection of February Site
Photos (Adobe Acrobat - PDF format) Collection
includes:
SOUTHAMPTON
Ribbon Cutting Ceremony (Home)
SOUTHAMPTON
Ribbon Cutting Ceremony (Participants)
Dec., 2006
Collection of December 2006 Site
Photos (Adobe Acrobat - PDF format) Collection
includes:
BLOCK D GREEN STREET - Street Cleaning
BLOCK D GREEN STREET - Landscape Installations
BLOCK E GREEN STREET - Asphalting Of Street
BLOCK F BUILDING 8 - Completed Cleaned Units
BLOCK D BUILDING 10 - Completed Cleaned Unit
BLOCK F BUILDING 3 - Tenant Items on Balcony
BLOCK E Completed Buildings
BLOCK D Completed Buildings
SOUTHAMPTON Completed Houses
Nov., 2006
Collection of Nov 28 and Dec 6, 2006 Site
Photos (Adobe Acrobat - PDF format) Collection
includes:
BLOCK F BUILDING 1
Rear Elevation
BLOCK F BUILDING 3
Front Elevation
BLOCK F BUILDING 5
Substantially Complete/Cleaned Up Units
BLOCK D BUILDING 11
Substantially Complete/Cleaned Up Units
BLOCK E REAR OF BUILDING 7
Newly Planted Trees in Passive Park Area
BLOCK D BUILDING 10
Appliances and Fixtures Installations
BLOCK D BUILDING 11
Carpet padding installation
BLOCK D BUILDING 12
Trees To Be Planted
BLOCK D BUILDING 12
Sidewalk / ADA Ramp Formwork
BLOCK D BUILDING 15
BLOCK D BUILDING 15
Mail Kiosk Construction
BLOCK D BUILDING 16
Appliances To Be Installed
BLOCK D BUILDING 16
Typical Kitchen counter installation
BLOCK D BUILDING 16
near substantial completion
SEPT., 2006
Collection of Sept., 2006 Site
Photos (Adobe Acrobat - PDF format) Collection
includes:
AERIAL VIEW LOOKING WEST
BLOCK F EAST NEAR BUILDING 2
Irrigation Piping Being Installed
BLOCK E BUILDING 6
Kitchen Area
BLOCK E BUILDING 6
BLOCK E BUILDING 7
Newly Installed Decorative Light Fixture in Parking Area
BLOCK E NEAR BUILDING 7
Freshly Poured Sidewalk
Mail Kiosk and Trash Container Enclosures
BLOCK D BUILDING 11
Installed Ceiling Elements (Light Fixtures/Smoke Detector)
Installed Sink w/ Fixtures & Unpainted Trim
BLOCK D BUILDING 11
Bathroom
BLOCK D BUILDING 11
Pressure Washing the Exterior Brick
BLOCK D BUILDING 12
Junction Boxes for yet to be Installed Ceiling Elements
Incomplete Bathroom
BLOCK D NEAR BUILDING 13
APCO At Work
Cable From Transformer to buildings
BLOCK D BUILDING 14
Laundry Area
BLOCK D BUILDING 14
Kitchen Area
BLOCK D BUILDING 15
Exterior Carroway Blvd. Side
BLOCK D BUILDING 15
Kitchen Area
BLOCK D BUILDING 15
Utility Closet and Laundry Closet
BLOCK D BUILDING 16
Kitchen Area
CONSTRUCTION OF HOUSES IN SOUTHHAMPTON
April, 2006
FEB., 2006
- Collection of Feb., 2006 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
BLOCK F EAST BUILDING 1
Scaffolding for Brick Installation
BLOCK F EAST BUILDING 1
Kitchen Area
BLOCK F EAST BUILDING 2
Tiled Bathtub/Shower
BLOCK E BUILDING 4
Bedroom w/ Uninstalled Doors & Frames
BLOCK E BUILDING 5
Kitchen Area in Loft Unit Building
BLOCK E BUILDING 5
Framing @ Mechanical Duct Bulkhead
BLOCK E BUILDING 5
Firestop Material Applied to Electrical Boxes @ a Common Units Wall
BLOCK E BUILDING 6
Siding Installation
BLOCK E BUILDING 6
Siding Trim Installation
BLOCK E BUILDING 8
Laundry Area
BLOCK E BUILDING 7
Framed Walls @ Bathroom Area
BLOCK E BUILDING 9
Kitchen Area
BLOCK E BUILDING 9
Above Ceiling Mechanical Ductwork
BLOCK D BUILDING 15
BLOCK D BUILDING 12
Roofing Membrane Installation
BLOCK D BUILDING 13
Roofing Decking Installation
BLOCK D BUILDING 14
Without Roof Truss Installed
BLOCK D BUILDING 13
Roof Truss
CONSTRUCTION @ YMCA ON 7TH AVENUE
A Grant Program Neighborhood Partner
Jan., 2006
- Collection of Jan., 2006 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
AERIAL VIEW LOOKING WEST
BLOCKS E & F
BLOCK F EAST BUILDING 1
Interiors w/ primed walls, door frames yet to be installed
BLOCK F EAST BUILDING 2
Walled in Kitchen area
BLOCK F EAST BUILDING 3
Scaffold for masonry installation
BLOCK E BUILDING 4
Walled in Kitchen area
BLOCK E BUILDING 6
Installation of Roofing Shingles in Progress
BLOCK E BUILDING 6
Kitchen area
BLOCK E NORTH OF BUILDING 4
Infrastructure Installation
BLOCK E NORTH OF BUILDING 7
Kitchen area
BLOCK D NORTH OF BUILDING 11
Installation of Roofing Felt Material
BLOCK E NORTH OF BUILDING 15
w/ Partial Building Wrap Installed and Window Installations in Progress
BLOCK D NORTH OF BUILDING 12
Walls on Third Floor, still being Installed
BLOCK D BUILDING 16
Installation of Roof Deck
CONSTRUCTION @ YMCA ON 7TH AVENUE
A Grant Program Neighborhood Partner
Dec., 2005
- Collection of Dec., 2005 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
BLOCK F EAST BUILDING 1
With partial installation of hardi-plank siding
BLOCK F EAST BUILDING 1
With bathtubs and inner wall electrical and plumbing items in place.
With firestop material installed
BLOCK E BUILDING 4
With building wrap and windows installed
BLOCK E BUILDING 4
With inner wall plumbing in bathroom, bathtub has yet to installed
Framed kitchen area, w/ inner wall plumbing and electrical components
BLOCK E BUILDING 5
With building wrap installed
BLOCK E BUILDING 5
Interior framing
BLOCK E BUILDING 6
With roof and interior framed
BLOCK E BUILDING 7
With building wrap, w/ out roof trusses
BLOCK E BUILDING 7
With framing at kitchen
BLOCK E BUILDING 9
With partial exterior sheathing and wrap installed
BLOCK D BUILDING 11
With floor truss for 3rd floor installed atop 2nd floor interior walls
w/ exterior sheathing, w/ building wrap at 1st floor.
BLOCK D BUILDING 15
With 2nd floor interior walls being framed, w/ exterior sheathing at 1st floor
BLOCK D BUILDING 16
Framing for first floor walls.
BLOCK D BUILDING 13, 12 & 10
Poured building slabs for buildings 13, 12 &
10 w/ building 8 on block E in background
Nov., 2005
- Collection of Nov., 2005 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
PARK PLACE Aerial LOOKING WEST
BLOCK F EAST BUILDING 2
Installation of building wrap in progress
BLOCK F EAST BUILDING 1
Interior wall framing with plumbing, mechanical and electrical rough-ins
BLOCK F EAST BUILDING 1
Kitchen rough-ins
BLOCK F EAST BUILDING 1
Laundry Room inner wall plumbing
BLOCK F EAST BUILDING 1
Supplemental blocking in wall for handrail
BLOCK F EAST BUILDING 2
Breezeway with freshly poured concrete
BLOCK E BUILDING 8
Materials for wall framing being hauled onto building
BLOCK E BUILDING 6 (foreground), 4 (beyond)
Building 4 with roofing plywood installation in progress
Building 6 with floor truss for second floor installed
BLOCK E BUILDING 8
Tilt-up of framing for second floor wall
BLOCK E BUILDING 7
Floor truss (foreground) prior to installation
BLOCK E BUILDING 9
Building slab in place
BLOCK D BUILDING 15
Building slab in place
BLOCK D BUILDING 13
Footing trench preparation prior to slab pour
BLOCK C LEASING BUILDING
Installation of decorative brackets
Oct., 2005
- Collection of Oct., 2005 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
PARK PLACE Aerial Photo looking West
South to North View of Parking Lot @ Block A
BLOCK A DEMOLITION COMPLETE / PARKING LOT INSTALLED / STRIPED
BLOCK F EAST BUILDING 1
Stick built interior wall framing w/ plumbing.
BLOCK F EAST BUILDING 2
Installation of Pre-Fab Roof Trusses
BLOCK F EAST BUILDING 3
Third floor truss have been installed, interior wall framing has begun.
BLOCK F EAST BUILDING 3
Interior stair being built.
BLOCK E BUILDING 4
1st Level Framed Walls
BLOCK E BUILDING 5
Preparing door and window headers.
BLOCK E BUILDING 9
On-site delivered wood for framing.
BLOCK D BUILDING 15
Trenches/forming for flowable fill @ footings/foundation wall, gravel bed for floor slab.
BLOCK D WEST
Building 14 slab in foreground w/ plumbing stubups for buildings 13, 12 & 10, exposed
PROJECT PLANNING AREA
Scan of Phase 1 & 2 16 block area map
PROJECTED PROJECT SITE
Looking Northwest from the 6th Avenue North/17th
Street North Intersection
Sept., 2005
- Collection of Sept., 2005 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
CITY OF BIRMINGHAM / UKRAINE OFFICALS DELEGATION
BLOCK A DEMOLITION COMPLETE
Southern Portion Asphalted for Parking Lot for Park Place Phases I & II
Northern Portion Seeded w/ Straw Covering
BLOCK B
Fresh Finish Topping at Green Street (also occurred in Block C)
BLOCK F EAST BUILDINGS 2 & 3
Poured Slabs w/ Lumber for Framing Stacked on Site
BLOCK E BUILDING 4
Slab Pour in Progress
BLOCK E BUILDING 8
Digging Perimeter Trenches for Flowable Fill
BLOCK E BUILDING 9
Formwork in Place for Slab Pour w/ Underslab Gravel in Place at Far End
BLOCK D
Welded Wire Mesh for Slabs Stored on Site
Building Pads for Buildings 13 & 14
PVC Piping for Underslab Utilities
Building Pad for Building 15
Aug., 2005
- Collection of Aug., 2005 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
BLOCK F
Poured Building Slabs w/ Exposed Utility Stub-ups
BLOCK E
Prep to pour concrete for footings
Underground plumbing/electrical stubups
BLOCK E FOOTING TRENCHWORK
BLOCK D (Looking West/North)
Building Pad For Terminus Building at the End of Park Place
BLOCK A
HazMat Container
Excavated Steam Tunnel
June, 2005
- Collection of June, 2005 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
AERIAL VIEW LOOKING EAST
BLOCK A
Demolition in Progress
BLOCK C BUILDING 4
South Elevation
BLOCK C BUILDING 4
Kitchen Area
BLOCK C BUILDING 4
Living Room Area in a First Floor Unit
BLOCK C BUILDING 4
Second Floor Interior Corridor
BLOCK C BUILDING 4
Second Floor Laundry Room
BLOCK C LEASING BUILDING
South Elevation
BLOCK C LEASING BUILDING
Atrium Area w/ Freshly Installed Molding/Trim
BLOCK C LEASING BUILDING
Lower Level Atrium Area w/ Freshly Installed Molding/Trim
BLOCK D West
Site Prep for Building Pads & Green Street
BLOCK D EAST
Site Prep for Green Street & Building Pads
BLOCK E WEST
Rough Grading
BLOCK E EAST Rough
Grading
May, 2005
- Collection of May, 2005 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
AERIAL VIEW LOOKING NORTH
BLOCK A
Commencement of Demolition
BLOCK A
Demolition in Progress
BLOCK C BUILDING 4
Tyvek Wrapped North Elevation
BLOCK C BUILDING 4
Installed Plumbing Fixtures / Electrical Panel
BLOCK C BUILDING 4
Attic Area Gypsum Board Fire Wall
BLOCK C LEASING BUILDING
Atrium Area
BLOCK C LEASING BUILDING
From Second Floor Into Atrium Area
BLOCK E
Rough Grading
March, 2005
- Collection of March, 2005 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
AERIAL VIEW LOOKING WEST
BLOCK C BUILDING 10
Completed Unit Prepared for PTO Walk Thru
BLOCK C NORTH BUILDING 18; LEASING CENTER
Brick Installation in Progress
BLOCK C NORTH BUILDING 18; LEASING CENTER
Brick Installation in Progress
BLOCK C NORTH BUILDING 4
Roof Substrate Installation in Progress
BLOCK F BUILDING 2
BLOCK F BUILDING 1
Sept., 2004
- Collection of Sept, 2004 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
BLOCK B - BUILDING 14
Exterior Painting
BLOCK B BUILDING 14
Interior Installations Carpet w/ pad & Kitchen Appliances/Floor Tile
BLOCK B - BUILDING 14
Interior Installations; Washer/Dryer (Above)
Utility Closet w/ Furnace/Water Heater & Thermostat/Security Panel on Wall
BLOCK B - BLDG. 14
Form Work in Preparation to Pour Side Walk
Pre-Cast Wall Caps @ Entry Stoop
BLOCK B - INNER COURTYARD
Parking Area Surface, Poured Concrete in Segments
BLOCK C - BUILDING 10
Framing for Interior Spaces
BLOCK C - BUILDING 10
Installation of Siding
BLOCK C - BUILDING 7
Installation of Brick
BLOCK C - BUILDING 6
Curved Plywood as Formwork to Lay Bricks in Arch
BLOCK C - BUILDING 5
w/ Underlayment Board & Roofing Felts
BLOCK C - BUILDING 18
Leasing Office Building Stick Built Framed
BLOCK F - BUILDING 3
Framed to 2nd Floor w/ Roof Framing on Ground
July, 2004
- Collection of July, 2004 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
BLOCK F BUILDING 1
Freshly Poured Building Slab
BLOCK F TRENCH FOR IRRIGATION SYSTEM
BLOCK F SOD INSTALLATION
BLOCK C LEASING BUILDING
Poured Slabs For Leasing Building Near Base of Smokestack
BLOCK C - BUILDING SLABS
Poured Slabs w/ Underground Plumbing Stubups
Building 5 Foreground
Building 7 Beyond
W/ Block B & Downtown Skyline
BLOCK C - BUILDING 9
Sub-roofing Installations
BLOCK B - BUILDING 14
Thru Floor Pipes w/ Code Required Fire Stop Material
BLOCK B - BUILDING 14
Newly Installed Bathtub
BLOCK B - BUILDING 14
Construction of Entryway Canopy
BLOCK B - BUILDING 13
Electricians Pre-wiring A Unit
BLOCK B - BUILDING 13
Tyvek Insulation Wrapped Building
BLOCK B - BUILDINGS 17 & 15
Off-Street Parking Side of Each Building
BLOCK B - BUILDING 17
From The Street Side Exterior Facade
June, 2004
- Collection of June, 2004 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
BLOCK B - BUILDINGS
- Buildings 14 & 15 w/ exterior brick, hardy board siding & windows installed
- Building 17 @ rear w/ exposed tyvek moisture protection
- Building 13 @ left w/ exposed exterior wood sheathing
- Building 12 slab in foreground
BLOCK B - BUILDING 14
Plumbing @ Laundry Room wall w/ PVC drain lines, red & blue (hot & cold) pex piping
BLOCK B - BUILDING 14
Installed Flex Mechanical Duct Work & Sprinkler Lines (orange piping) in ceiling space
BLOCK B - BUILDING 17
Framed Living Room in a Townhouse Unit overlooking 22nd Street
BLOCK C NORTH - BUILDING 9
Installing Floor Truss (additional truss in foreground)
BLOCK C NORTH - BUILDING 10
Underslab Utilities / Trenches to form thickened slabs, at wall locations.
BLOCK C NORTH - BUILDING 6
Markings on slab indicating wall / door locations and location numbers for the various wall panels
MARCONI PARK
Mock-up of truncated pavers inset
BLOCK F WEST - BUILDING 3
- Preparing for footing trenches
- Form filled footing trench in foreground
BLOCK D
Wiring
installation at new light fixture
May, 2004
- Collection of May, 2004 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
BLOCK B - BUILDINGS 16 & 17 -
From The 3rd Floor Of Building 14 A View Of Downtown BLOCK B -
BUILDING 14- Green Street
Elevation
BLOCK B
- BUILDING 14 Wiring To Electrical Panel W/ Sheetrock in
Background BLOCK C NORTH - BUILDING 9 Underslab Work: Gravel,
Plumbing Stubups SIDEWALK CORNER WORK - Intersection of 6th Avenue
& 25th Street
April, 2004
March, 2004
- Collection of March, 2004 Site Photos (Adobe Acrobat - PDF format)
Collection includes:
BUILDING #17: PLUMBING STUB-UPS
BUILDINGS SAMPLE MOCK-UP
BLOCK C: GREEN STREET LOOKING EAST
BLOCK C: GREEN STREET LANDSCAPING
24TH STREET LOOKING SOUTH FROM 7TH AVENUE - SEWER LINES AND LATERALS HAVE BEEN INSTALLED
NEW SIDEWALK ALONG CALLOWAY AVENUE
December, 2003
November, 2003
September, 2003
September, 2002
August, 2002
March, 2002
Jump To Top
Copyright © 2002 Boulevard Group, Inc.
484 Boulevard, SE
Atlanta, GA 30312
Main: (404) 622-7879
Support: (678) 428-8635 (Anytime Night or Day)
E-mail: Support
Release: 1.01.001  Release Date: June 7, 2003
|